Projects

                  2000 ► 2004 KLOOF GOLD MINES        

Secondary support, Ventilation walls, Sets, Void Filling, Mechanical Anchors.

Mr. D Geyser, Mr. P Greyling, Mr. G Oliver, Mr. K Stead

2002 KLOOF GOLD MINE 5#

Shaft Rehabilitation

Mr. C van Zyl

2001  ► 2008 DRIEFONTEIN GOLD MINES

Secondary support, Ventilation walls, Sets, Void Filling, Reclamation etc.

Mr. E Scoltz, Mr. G Pienaar, Mr. A Katake, Mr. E Schoeman, Mr. D van Straaten, Mr. F Cronje, Mr. K Horn

2001 ► 2004 MODIKWA

Rehabilitation of tunnels

Mr. E Scoltz

2003 ► 2004 SWARTKLIP – SAISVIC MINING

Void filling and Set Installation

Mr. P Botha

2004 ► 2006 MURRAY & ROBERTS

RUC – Doornkop ► Developing, Ring Set installation and Void Filling

Mr. W Pearson

2013 ► 2013 MURRAY & ROBERTS – MPUMELELO

Decline ► Porthole and Slopes Consolidation. Pin Conveyor.

Mr.J Prinsloo

2008 ► 2009 KLOOF GOLD MINE

Installation of Steel Arch Sets, Void Filling, Installation of Mechanical Anchors, Install Wire Mesh and Split Sets, Grouting, etc.

Mr. G Nell

2009 ► 2009 GRINAKER LTA (CRG)

Set Installation, Void Filling

Mr. F van der Hoff

2009 – 2014 GRINAKER LTA (THUBELISHA)

Consolidation of Porthole and Hanging and Side Walls, Guniting (Wet Crete)

Installation of Long Anchors, Sets and Chemical and Air-Rated Cem Void Filling.

Mr. A Drotsky

2009 – 2011 HARMONY (DOORNKOP SHAFT)   

Water Sealing in Shaft and Dams, Consolidation of dykes. Secondary support.

Mr. J du Triou

2010 – 2012 CROCODILE MINE (VERTICAL AND DECLINES)

Water Sealing, Set Installation, Chem&Cem Void Filling, Consolidation, Diamond Drilling,Shot Crete (Wet Crete), Installation of Mechanical Anchors & General Constuction.

Mr M Steinmann

2013 PHALABORWA COPPER MINING

Water Sealing & Consolidation, Set installation and Chemical Void Filling.

Mr F Naude

2014 – 2014 GLENCORE – ELANDMINE

Chemical Water Sealing & Ground Consolidation.

Mr B Issit

2014 – 2014 AQUARIUS – KWEZI SHAFT

Chemical Void Filling.

Mr G Botha

2014 – 2015 GHAGHOO DIAMOND MINE – BOTSWANA

Chemical Water Sealing.

Mr K Kario

2015 LONMIN – VENT SHAFT

Chemical Water sealing / Consolidation

Mr E Bridell

2011 – Currently MASEVE PROJECT (DECLINES – North and South)

Port Hole Consolidation, Set installation and Chemical and Air-Rated Cement Void Filling, Wire Mesh & Lace, Mechanical Anchors and Wetcrete. All secondary support.

Mr K Badenhorst – DRA  – JP Arora – JIC, N Sutherland – JIC

2013 – 2015 HARMONY – DOORNKOP

Installation of Sets, Chemical and Air-Rated Cement Void Filling and Consolidation

Mr J du Triou

2015 – Currently BATHOPELE MINE

Installation of Sets and Void filling

Mr L vd Heever, Mr J Matsomabe

2015 – 2016 AVENG (GRINAKER-LTA)

Water sealing, Bunkers and all Man holes

Mr R Muirhead