2000 ► 2004 KLOOF GOLD MINES
Secondary support, Ventilation walls, Sets, Void Filling, Mechanical Anchors.
Mr. D Geyser, Mr. P Greyling, Mr. G Oliver, Mr. K Stead
2002 KLOOF GOLD MINE 5#
Shaft Rehabilitation
Mr. C van Zyl
2001 ► 2008 DRIEFONTEIN GOLD MINES
Secondary support, Ventilation walls, Sets, Void Filling, Reclamation etc.
Mr. E Scoltz, Mr. G Pienaar, Mr. A Katake, Mr. E Schoeman, Mr. D van Straaten, Mr. F Cronje, Mr. K Horn
2001 ► 2004 MODIKWA
Rehabilitation of tunnels
Mr. E Scoltz
2003 ► 2004 SWARTKLIP – SAISVIC MINING
Void filling and Set Installation
Mr. P Botha
2004 ► 2006 MURRAY & ROBERTS
RUC – Doornkop ► Developing, Ring Set installation and Void Filling
Mr. W Pearson
2013 ► 2013 MURRAY & ROBERTS – MPUMELELO
Decline ► Porthole and Slopes Consolidation. Pin Conveyor.
Mr.J Prinsloo
2008 ► 2009 KLOOF GOLD MINE
Installation of Steel Arch Sets, Void Filling, Installation of Mechanical Anchors, Install Wire Mesh and Split Sets, Grouting, etc.
Mr. G Nell
2009 ► 2009 GRINAKER LTA (CRG)
Set Installation, Void Filling
Mr. F van der Hoff
2009 – 2014 GRINAKER LTA (THUBELISHA)
Consolidation of Porthole and Hanging and Side Walls, Guniting (Wet Crete)
Installation of Long Anchors, Sets and Chemical and Air-Rated Cem Void Filling.
Mr. A Drotsky
2009 – 2011 HARMONY (DOORNKOP SHAFT)
Water Sealing in Shaft and Dams, Consolidation of dykes. Secondary support.
Mr. J du Triou
2010 – 2012 CROCODILE MINE (VERTICAL AND DECLINES)
Water Sealing, Set Installation, Chem&Cem Void Filling, Consolidation, Diamond Drilling,Shot Crete (Wet Crete), Installation of Mechanical Anchors & General Constuction.
Mr M Steinmann
2013 PHALABORWA COPPER MINING
Water Sealing & Consolidation, Set installation and Chemical Void Filling.
Mr F Naude
2014 – 2014 GLENCORE – ELANDMINE
Chemical Water Sealing & Ground Consolidation.
Mr B Issit
2014 – 2014 AQUARIUS – KWEZI SHAFT
Chemical Void Filling.
Mr G Botha
2014 – 2015 GHAGHOO DIAMOND MINE – BOTSWANA
Chemical Water Sealing.
Mr K Kario
2015 LONMIN – VENT SHAFT
Chemical Water sealing / Consolidation
Mr E Bridell
2011 – Currently MASEVE PROJECT (DECLINES – North and South)
Port Hole Consolidation, Set installation and Chemical and Air-Rated Cement Void Filling, Wire Mesh & Lace, Mechanical Anchors and Wetcrete. All secondary support.
Mr K Badenhorst – DRA – JP Arora – JIC, N Sutherland – JIC
2013 – 2015 HARMONY – DOORNKOP
Installation of Sets, Chemical and Air-Rated Cement Void Filling and Consolidation
Mr J du Triou
2015 – Currently BATHOPELE MINE
Installation of Sets and Void filling
Mr L vd Heever, Mr J Matsomabe
2015 – 2016 AVENG (GRINAKER-LTA)
Water sealing, Bunkers and all Man holes
Mr R Muirhead